AASMIS-S is the Management Information System of a AAS-S (Autoconer Automation
System - Savio) developed by Zircon Infotech for a spinning industries.
AAS-S interface MIC of Savio Orion Autoconer with computerand
received the production data when user get the printout, generally it will get at
the end of shift at Savio Machine. AAS-S check the data, if it shift end data then
it will insert into data file. After that AASMIS-S will generate various types of
MIS Reports on the basis of cuts, efficiency, losses due to various reasons and
productions etc.
Generally user does not get the details of each drum on the
paper at the end of shift, because if it will take the the printout then it will
required more than 20 meter thermal paper to get the printout of each machine and
each shift. Not only to them but apart from them lot of reasons
are there to utilize this system at industry
So that user view the details of each drum on the machine and does
not compared the value with the other machine or compared the values from the other
drums of all the parameters.
By using the above system any industry can get the drum wise production
details at the end of shift by pressing a button.
It is an excellent monitoring system to take rapid actions and decisions
against abnormal drums, material(higher/lower cuts), Men (where yellow lights is
higher) and etc.. The system generates lot wise production details, machine wise
production details, abnormal drums on the basis of sigma values and the average
value, long term analysis for a machine, and machine wise breakup of a parameter
etc.
AASMIS-S helps to Industry to segregate material where quality of
yarn is not good e.g. we can separate material of particular drum where no. of cuts
are very high or very low.
By monitoring above reports and taking appropriate actions, industries
can automatically improve their efficiency.
After few years when the existing autoconers does not work with
full efficiency and the efficiency of production godown slowly slowly then industry
has required to either upgrading their autoconers or purchase new autoconer machine
to produce more yarns. But if the industries installed the Autconer Automation System
then may be he does not required to purchase new autoconers immediately and get
execute their machines with full efficiency upto long time. We are given a comparision
between Autoconer Automation System with new Autoconer machine below:
Comparision 1 :
Comparision 2 :
Suppose a Industry have 10 no.s of Autoconers and improve their efficiency upto
5% they they have save the total production cost as follows :
Lets assume that each autoconer produce 2000 Kg of yarn per day and the
production cost involve on autoconer is Rs. 10/Kg.
Then industry save 2000kg * Rs. 10kg * 5% * 10 autoconers * 365 days = Rs. 3650000
in a year
If industry assume that he does not save Rs. 10/kg production cost at autocoro machine
due to their inner infrastructure and they can saved only Rs. 2/kg then the savings
are: Rs.730000 per year
Comparision 3:
Suppose, the industry assume that he can not achieved the efficiency upto 5% and
does not save the production cost still but he can cut down the reduction waste
by 0.1% then he can saved the cost as follows :
Lets us assume that the cost of yarn is Rs. 80/kg and industry produced 2000kg of
yarn / day / autoconer Saving by Reduction waste : 10 autocoro * 2000 kg * 0.1%
* Rs 80/kg * 365 days = Rs. 584000 per year.
Industry can get this savings every year with putting only very less efforts
to viewing the production and abnormal drum reports and take the actions accordingly
at their chair.
1.Saving in Thermal Paper Cost: Every Autoconer prints data for 60 drums for all
30 paramete per shift and it takes 3 meters of roll. It costs Rs. 3 per meter. The
total paper cost for 8 Autoconers in one year = 8 Autoconers x 3 shifts x 365 days
x 3 meters x Rs. 3 per meter = Rs. 78,840.
2.Increased Earning due to Increase in Efficiency: It has been noticed that after
installation of automatic reporting system, the efficiency increased by as much
as 7-8 %. Even if we expect a modest figure of 1%, which is not at all difficult
to achieve, this will lead to a increased production of 1%.Each Autoconer produces
2000 Kg. of yarn @Rs. 10 per Kg. This means a daily production of Rs.20,000 per
Autoconer per day. The increased earning due 1% efficiency increase will be only
Rs. 200 per day.For 8 Autoconers and for 365 days, the additional earnings will
be Rs. 200 x 8 Autoconers x 365 days =Rs. 5,84,000.sp;
3.Reduction in Hard Waste: A nominal reduction of hard waste to final production
ratio by 0.1 % gives us asaving as follows Rs.80 per Kg x 0.1% x 2000 Kg x 8 Autoconers
x 365 days = Rs.4,67,200.
4.Reduction in manpower Costs: Since this automatic system saves the cost of 1 persons
@Rs.10,000 per month, the annual saving is Rs.10000 x 1 persons x 12 months = Rs.
1,20,000.