COROMIS is an excellent monitoring system to view
the shift wise, periodically and comparitively production details of each machine
and rotors on a single page and compare the off standard, YM lock, High dust value
etc very quickly.
CAS to interface MIC of Schlafhorst 288 Autocoro with computer and
fetch the production data at the end of each shift.After that COROMIS will generate
various types of MIS Reports on the basis of production data.
COROMIS is the Management Information System of a CAS (Autocoro Automation
System) developed by Zircon Infotech for a spinning industries.
Generally the particals of cotton or polyester damaged the
workingof thermal printer and user does not get the printout of shift end report.
In this case user noted the reading at the MIC on the register and compared the
result. If the printer is in working position then also user does not get the printout
of all parameters, because to study of all parameters it required much more time
as well as the cost of thermal paper is also costly. Not only the above reasons
but apart from them lot of reasons are there to utilize
this system at industry.
The system generates lot wise production details, machine
wise production details, off standard rotors, High dust value rotors, rotors of
YM Lock due to various reasons, False yarn length rotors, Stop Spinning position
etc.
By monitoring above reports and taking appropriate actions, industries
can automatically improve their efficiency. As per the actions and material of yarn
it may increased by 4 - 5 % easily.
After few years when the existing autoconers does not work with
full efficiency and the efficiency of production godown slowly slowly then industry
has required to either upgrading their autoconers or purchase new autoconer machine
to produce more yarns. But if the industries installed the Autconer Automation System
then may be he does not required to purchase new autoconers immediately and get
execute their machines with full efficiency upto long time. We are given a comparision
between Autoconer Automation System with new Autoconer machine below:
Comparision 1 :
Comparision 2 :
Suppose a Industry have 10 no.s of Autoconers and improve their efficiency upto
5% they they have save the total production cost as follows :
Lets assume that each autoconer produce 2000 Kg of yarn per day and the
production cost involve on autoconer is Rs. 10/Kg.
Then industry save 2000kg * Rs. 10kg * 5% * 10 autoconers * 365 days = Rs. 3650000
in a year
If industry assume that he does not save Rs. 10/kg production cost at autocoro machine
due to their inner infrastructure and they can saved only Rs. 2/kg then the savings
are: Rs.730000 per year
Comparision 3:
Suppose, the industry assume that he can not achieved the efficiency upto 5% and
does not save the production cost still but he can cut down the reduction waste
by 0.1% then he can saved the cost as follows :
Lets us assume that the cost of yarn is Rs. 80/kg and industry produced 2000kg of
yarn / day / autoconer Saving by Reduction waste : 10 autocoro * 2000 kg * 0.1%
* Rs 80/kg * 365 days = Rs. 584000 per year.
Industry can get this savings every year with putting only very less efforts
to viewing the production and abnormal drum reports and take the actions accordingly
at their chair.
1.Saving in Thermal Paper Cost: Every Autoconer prints data for 60 drums for all
30 paramete per shift and it takes 3 meters of roll. It costs Rs. 3 per meter. The
total paper cost for 8 Autoconers in one year = 8 Autoconers x 3 shifts x 365 days
x 3 meters x Rs. 3 per meter = Rs. 78,840.
2.Increased Earning due to Increase in Efficiency: It has been noticed that after
installation of automatic reporting system, the efficiency increased by as much
as 7-8 %. Even if we expect a modest figure of 1%, which is not at all difficult
to achieve, this will lead to a increased production of 1%.Each Autoconer produces
2000 Kg. of yarn @Rs. 10 per Kg. This means a daily production of Rs.20,000 per
Autoconer per day. The increased earning due 1% efficiency increase will be only
Rs. 200 per day.For 8 Autoconers and for 365 days, the additional earnings will
be Rs. 200 x 8 Autoconers x 365 days =Rs. 5,84,000.sp;
3.Reduction in Hard Waste: A nominal reduction of hard waste to final production
ratio by 0.1 % gives us asaving as follows Rs.80 per Kg x 0.1% x 2000 Kg x 8 Autoconers
x 365 days = Rs.4,67,200.
4.Reduction in manpower Costs: Since this automatic system saves the cost of 1 persons
@Rs.10,000 per month, the annual saving is Rs.10000 x 1 persons x 12 months = Rs.
1,20,000.